Curb And Gutter Detail Fdot
Concrete gutter curb elements and traffic separator.
Curb and gutter detail fdot. Typical details for inside lane widening of freeways. 43 curb gutters and sidewalks. Rd11 ts 6 typical curb gutter sections with shoulders and with grass strips. Rd11 ts 6a typical curb gutter sections without shoulders and with grass strips.
14 typical construction details general notes. Revision last 2013 fdot design standards gutter construction future curb and 2 exp. Curb ramp and detectable warning details. Josh keith m standards engineer 303 757 9021 email josh.
Curb and gutter 300. Concrete shoulder gutter spillway 284. Integral curb and integral curb gutter. Contact us standards specifications unit.
Concrete barriers traffic railings and parapets. Joint 1 20 r or as shown on plans 4. Special details concrete sidewalk details curb cut wheelchair ramps details ada drainage drainage structures pedestrian facilities roadway sections 9 15 2016. Approach curb gutter downspouts for bridge approach curb and gutter special.
Integral curb and gutter shall conform to the details shown for concrete curb and gutter including the transverse gutter slope. Concrete curb and concrete curb gutter. Index r d 9 6 0 r h description. This detail replaces ga standard 9031w.
Shawn yu unit manager 303 757 9474 email shawn. Curb gutters and sidewalks m 609 1 all. Rd11 ts 6b typical curb and gutter sections with shoulders and without grass strips. Curb curb and gutter 6 2 8 2 0 1 2 9 3 7 5 1 a m r e v i s i o n c d p r o j e c t s s t a n d a r d s r o a d w a y 0 0 3 0 0 s 0 0 3 0 0 0 1 d g n no.
Revision dates curb and curb gutter dwg. Curb and gutter endings adjacent to flexible pavement curb and gutter and type a curb contraction joint in curb concrete bumper guard asphaltic concrete curb contraction joint in curb and gutter and concrete pavement expansion joint between gutter sawcuts should be avoided within valley gutter and within curb and gutter endings. 43 curb gutters and sidewalks. Materials and construction shall conform to the fdot standard specifications for road and bridge construction.
Unless otherwise shown on the typical cross sections the base aggregate and common excavation limits are 2 0 behind the back of curbs. Median opening flume 283. Joshua palmer guardrail engineer.